Where to place heaters

In STEEL GULLET, place the heater below the object you want to warm. Oxideworks clarified that “above” refers to the object sitting above the heater. Put a probe pile on the path and check its state before building a row of heaters.

Full Steam release unless a source specifies the demo. Evidence checked . Guide updated .

Steps

  1. Find the tile the pile actually travels through, especially where an elevator changes layers. Place the heater underneath that tile and leave access to inspect the path.
  2. Watch one pile at the entrance and immediately after the heater. Compare its temperature and phase. A change shows the stage is making contact even if it has not yet crossed the threshold for your downstream machine.
  3. Check which state the next machine needs. If you need ductile material, stop above softening and below melting. If you need a liquid branch, add heat only until that material melts and check whether other materials are still solid.

How to tell it worked

An input pile changes temperature above the heater and reaches the required state at the entrance of the next machine.

If you are still stuck

If the numbers do not change, trace the item path on the correct layer before adding another heater. If the numbers do change but the machine rejects the pile, check the material’s required state rather than moving the heater again.

Check the height using a single item

Follow the item belt from the last junction and look at the object as it arrives above the heater. At an elevator, follow the exit route at the new layer. Compare the item reading just before entering the heater tile and at the first point you can inspect after it. If the item did not pass directly overhead, correcting that path is the useful first change. Adding more units along the wrong layer leaves the original sample untouched. Confirm the placement again with one item before extending the line.

If the temperature rises but the state remains the same, check the thresholds in the material book. A correctly placed heater can increase the reading without crossing the required boundary. Record the actual input and output values on one sample and compare them with the intended state. For a forming job, that usually means checking a softened state at the machine entry. For drainage, check whether the intended material is liquid and the material you need on the belt is still solid.

Read the sample again where the next machine receives it

Place the second inspection point wherever the next machine takes the pile. For a melt-and-drain line, this is where you compare the two materials before the separator sends them down different exits. For a press, check the property on arrival. A temperature increase at the first heater is useful progress, and the condition at the final inlet establishes whether the job can run. If those readings imply different problems, change one stage and walk a fresh sample through both points again.

Choose what to fix based on the observation

If every test pile arrives unchanged, check its route across the heater and repeat the placement test. If only warm piles lose the desired solid state, the range of incoming temperatures matters. Check the warm and cold sample separately instead of turning a whole group of heaters up together. If output at the heater is correct and the separator still passes both materials onward, inspect the actual separator input and exits. This keeps a heater placement check separate from a material-phase or routing problem. Record which machine and layer you used if your build behaves differently from the developer's description.

Related tasks

Sources