How to separate rubber and plastic
In STEEL GULLET, use two heater stages with a liquid separator after each. Melt and drain the rubber first while the plastic is still solid. Heat the solids that continue down the belt again, then drain the plastic at the second separator.
Full Steam release unless a source specifies the demo. Evidence checked . Guide updated .
Set the first cut from the incoming temperature
Open the material book in the upper right and look up both melting points. Then inspect the mixed pile before it enters the heater section. You want the first separator to see liquid rubber and solid plastic at the same time. Write down the colder and warmer temperatures you actually see at the inlet if the feed comes from several machines.
Add the heater increments to the incoming temperature. In the full-release player example, rubber melts at 180 °C and plastic at 220 °C. The player used a first-stage rise of 65 °C, split between +50 and +15. The table applies that same rise to three example inputs. Check the book and the material at your separator before copying any of these numbers.
| Incoming pile | At first cut | Expected states |
|---|---|---|
| 105 °C | 170 °C | Both remain solid. |
| 120 °C | 185 °C | Rubber can drain. Plastic stays solid. |
| 160 °C | 225 °C | Both can melt into the same output. |
Under those example values, the cold input needs at least a 75 °C rise to reach the lower melting point, while the warm input needs a rise of less than 60 °C to stay below the higher one. There is no fixed rise that satisfies both examples. If your actual feed spans a range like that, test groups with similar starting temperatures before reconnecting the whole feed.
Build two outlets and follow one pile through both
- First heater and separator. Put the heaters below the pile path, ahead of the first separator. Give the liquid output its own short branch so you can inspect the product there. In the player example, the 120 °C test pile reaches 185 °C at this cut.
- Through belt. Inspect the material that continues beyond the first separator. It should still contain solid plastic. Place the second heater on this through belt. With the example's additional +50 °C, the remaining material reaches 235 °C.
- Second separator. Send its liquid to a different branch and inspect it before attaching a mold, production machine or merger. That keeps a fault in forming or downstream routing from looking like a bad first split.
The cut is working when you can trace rubber to the first liquid branch and plastic from the same pile to the second. Repeat with the warm and cold ends of the feed you intend to connect.
Find the first outlet that disagrees with the test
- Both materials drain at the first separator
- Inspect the temperature at that separator. If it has reached the higher melting point, start again with a fresh pile and reduce the first rise. For material that is already mixed as liquid, read the mixed-liquid recovery guide before sending it back into the same line.
- The first outlet is empty
- Read the state just before the separator. If the pile is still solid, check the heater position and the incoming temperature. If the expected liquid is present there, follow the liquid outlet itself.
- The test outlets are clean but production is mixed
- Trace both branches from the separators to the machine receiving the wrong feed. Check for a shared merge or material left from the previous run. If a third ingredient already goes liquid before the first cut, use the material book to find a separate property you can use to remove it.