How to build your first scrap sorting line
In STEEL GULLET, build one visible separation step around the material your next quota needs. Keep a through belt for the rest of the pile, then confirm both outputs with a test before adding a second separator.
Full Steam release unless a source specifies the demo. Evidence checked . Guide updated .
Steps
- Read the next G.R.I.D. requirement and identify the material and form. Inspect one pile at your current source to see if it contains useful input. Find that material in the book.
- Pick a property to exploit. For example, the official description uses heat and drainage for rubber and grinding followed by a magnet for iron. Leave untreated material a path of its own.
- Leave a place to see both branches. Run a fresh sample and trace it all the way to the outlet. Check that the intended product reaches the correct exit before routing it into research.
- Once the first branch works, choose what to do with the remainder and repeat. Protect any whole item you will need later by moving a crusher off the common inlet.
How to tell it worked
A sample produces the desired output form while the remaining material keeps flowing. You can tell at which step a second sample diverges.
If you are still stuck
If the line needs a rebuild, leave one temporary route supplying the quota if possible. Adding new machinery to every pile can obscure which property or belt caused the original failure.
Design the first trial around a quota you can see move
Choose one current requirement and write down the requested material and form. Inspect a handful of incoming scrap piles before deciding that your current outlet is a useful supply. Keep the first test line short enough to watch a single pile throughout. Leave space at the first split for two visible exits. Mark which exit you expect to use for the target item and what will continue by the other route.
Open the relevant book entries for the sample and pick the property you can change or filter. If the simplest available route uses heat, choose one stage and inspect the selected material at the separator. If you are preparing iron for a magnetic cut, use a sample of iron scrap and compare its form before and after grinding. Leave intact input somewhere to go while you test the powdered branch. A growing factory needs a way to handle material that has yet to be assigned a process.
Check the exit before you build the rest of the line
Watch one sample move from the cut to a destination you can inspect. If it has the right material in the wrong form, identify the next operation before connecting the main delivery path. Route one suitable sample into research and check the counter. If the counter increases, you have a test for later changes. If it does not, follow the item to the end and read its name and properties again before changing the source.
Try several fresh scrap samples once the first one passes. If warm and cold piles react differently, measure their temperatures at the point where they enter the factory and at the separator. If success changes only after another branch is connected, investigate the common section before touching the separation stage.
Keep the first working scrap output available during expansion
Add back the rejected material one branch at a time. Label the destination of each stream and the state it needs at the input. If movement slows, look for where two streams join or where an elevator takes them out of sight. Leave your verified output route open while diagnosing a second producer. This sequence lets the quota keep moving while you decide which part of the scrap line needs the next machine.