How to diagnose a conveyor backup
In STEEL GULLET, trace the congested belt downstream before replacing it. A player found the obstruction under an elevator after suspecting the conveyor’s speed. Separating one compound pile into two also gives the outgoing line more piles to carry.
Full Steam release unless a source specifies the demo. Evidence checked . Guide updated .
Steps
- Pick a point where the belt repeatedly stops and watch where movement resumes. Inspect the next merges, exits and elevator connection from the side or another layer.
- At a separator, check each output independently. If two branches return immediately to a shared line, watch what happens when they arrive together. The pile count can rise even as the mass in each stream falls.
- Try one clean sample or reduce the input while tracing the blockage. If the downstream section starts flowing consistently, restore the normal load one branch at a time to identify which combination exceeds the route.
How to tell it worked
You can identify the first blocked junction or machine and confirm normal flow once the offending section has been corrected.
If you are still stuck
A brief pause at a machine is different from a queue that grows. Check several piles and inspect both sides of the machine before choosing a faster route or another parallel branch.
Trace the queue in the direction of travel
Pick a busy belt segment where you can see items stop and start. Follow the next pile toward the consumer. Look for the first point where material stops leaving as quickly as it arrives. A belt segment upstream may appear stopped because an outlet several machines later is full. Check the route under an elevator from a second angle. The player who suspected conveyor speed found the hidden queue at that kind of junction.
Observe a complete cycle when possible. A short pause followed by the belt clearing is different from a line that keeps filling after every batch. Check the output of the machine and the next belt before assuming a pause at the input proves a faulty machine.
Isolate a separator exit and then test the merge
Watch each exit at the separator before you watch the combined route. Dividing a compound sample can send two piles onwards even though each individual pile is smaller. If they join at the same point, inspect whether the combined belt receives those piles close together. A trial with one branch will give you a reference. Reopen the other branch and see exactly where the queue appears. That difference points to the handling of two outputs at once.
If the two outputs each leave and stop at the same merge, look at the common belt first. If one exit never clears even with the other disconnected, inspect that route and its first destination separately. If both move while the problem occurs only with another room feeding the line, trace the input that changed before swapping to a different conveyor.
Verify the corrected part under normal operation
Run a few samples after the change and include the normal combination of inputs. Note a location just upstream of the old blockage and another after it. See whether the belt empties between groups or whether the queue still grows. If an elevator hides one side, inspect both levels again. Put the rest of the line back on the corrected branch only after the previously blocked spot has passed the same trial. If the backlog returns later, the first changed observation gives you the next useful place to look.